Production & delivery timeline

Period Underwear Production & Delivery - From Sample to Shelf

Your custom period underwear, manufactured in Shantou and shipped on your timeline.

LJ Underwear produces custom period underwear and period swimwear for private-label brands across 28 countries. Every order moves through the same three gates: a 72-hour first sample from an approved tech pack, 25-50 days of bulk production by order volume, and shipment from Shenzhen to your destination, whether that is an Amazon fulfillment center in the US or a 3PL in Berlin.

This page covers production lead times, shipping routes, Incoterms, and the variables that move your timeline. For packaging specifications, see our Amazon FBA packaging page.

Incoterms & routes

How We Ship - Incoterms & Routes

A manufacturer's delivery promise is only meaningful when the terms are explicit. The table below maps the two standard shipping routes and where responsibility transfers at each stage.

StageAmazon FBA - United StatesDDP - EU, UK & Canada
Origin handlingShenzhen facilityShenzhen consolidation
PackagingFBA-compliant prep, with details on the packaging pageMarket-specific labeling
FreightOcean or air to assigned US fulfillment centerOcean or air to destination FBA or 3PL
Customs & dutyPaid by buyer at US port; we provide commercial invoice and packing listPaid by us under DDP, landed cost inclusive
Delivery to shelfDirect to Amazon inboundDirect to EU/UK/CA FBA or 3PL
Default IncotermFOB ShenzhenDDP destination
Alternative termsEXW on requestEXW / FOB on request

Amazon FBA Route - United States

For US brands, orders ship from our Shenzhen facility to the assigned Amazon fulfillment center. Packaging and labeling are completed to Amazon inbound standards before the goods leave Shenzhen; the full packaging specification is documented on our Amazon FBA packaging page.

The buyer receives tracking once the shipment is tendered to the forwarder. Customs clearance at the US port is handled by the buyer's broker using the commercial invoice and packing list we provide with every shipment.

DDP Route - EU, UK & Canada

For European and Canadian brands, the default term is DDP (Delivered Duty Paid). Import duty, VAT or GST, and last-mile freight to the destination FBA or 3PL are included in the quoted landed cost. The buyer does not handle a separate customs step.

Compliance documents, including PFAS-free test reports, OEKO-TEX Standard 100 Class I certificates, and market-specific declarations, are available on our certifications page.

Indicative lead time

Production Lead Time by Sample and Volume

Lead time figures below are indicative benchmarks based on confirmed repeat programs. Actual dates are set per purchase order after tech-pack review and capacity confirmation.

72hFirst sample from an approved tech pack for fit and absorbency review.
25-50 daysIndicative bulk production range from PP sample confirmation, depending on order volume.
MilestoneTimelineNotes
First sample72 hoursFrom an approved tech pack. A representative unit for fit and absorbency review.
Pre-production sample7 daysUses the same materials and construction planned for bulk. Required for sign-off before bulk cutting.
Bulk ≤ 20,000 pcs25-35 daysCounted from PP sample confirmation, not from first inquiry.
Bulk ≤ 100,000 pcs35-50 daysConfirmed per PO after tech-pack and capacity review.

How These Ranges Work

The ranges move with SKU complexity, material readiness, and QC cadence. A single-style, single-fabric program using stocked core fabrics sits at the lower end. A multi-SKU program with custom-dyed fabrics, printed artwork, and bonded barrier layers sits at the upper end.

A 30% deposit locks production capacity and the line slot at PO confirmation. Programs with pre-stocked core fabrics move faster because materials can be staged before repeat production.

MOQ & Reorder

Period panties start from 50 pcs per color per size, with reorder gradients at 100 and 500 pcs. Period swimwear starts from 100 pcs per color. Nursing bras, plus size bras, and incontinence underwear follow a 50 pcs per color per size starting point.

Lower first orders are possible on existing block patterns; the quote states the applicable MOQ per style.

Sample to shelf

From Sample to Bulk - The Production Flow

This five-step flow maps the buyer's review, factory production, QC, and shipment handover to a single delivery route.

Tech pack and NDA review for custom underwear sample
01

Tech Pack & NDA

The buyer shares a tech pack under a signed mutual NDA. No pattern work starts before the NDA is in place. The tech pack should include style drawings, material specifications, size chart, and absorbency requirements.

72-hour first sample for period underwear or swimwear
02

72-Hour First Sample

A representative first sample is produced on our Shantou production floor and shipped for fit and absorbency review. Custom fabrics, if specified, are sourced in parallel and integrated at the PP sample stage.

Pre-production sample confirmation before bulk cutting
03

PP Sample Confirmation

A pre-production sample confirms materials, construction, artwork placement, and sizing before bulk cutting begins. This is the last checkpoint before the production line is committed.

Bulk production with AQL inspection
04

Bulk Production with AQL 2.5

Bulk runs on dedicated sewing lines with inline QC checks at each production stage. A final AQL 2.5 inspection gates every order before finishing. See our QC process page.

Shipment handoff from Shenzhen for FBA or DDP delivery
05

Shipment Handoff

Goods are packaged to destination requirements and handed off to the forwarder in Shenzhen. For Amazon sellers, detailed packaging requirements are covered on our Amazon FBA packaging page.

Timeline variables

What Moves Your Timeline

These four variables determine whether your order ships at the lower or upper end of the lead time range.

01

Material Readiness

Stocked core fabrics and bonded membranes start immediately. Imported or custom-dyed materials add lead time before the first cut. If your program requires a fabric outside our standard library, factor in 7-14 additional days for sourcing and lab-dip approval.

02

SKU Complexity

A single-style, single-fabric run is the fastest path through production. Every additional SKU, especially those with printed artwork, bonded barrier layers, or non-standard size runs, adds production days.

03

Artwork & Packaging Files

Custom printed waistbands, woven labels, and branded packaging components are sourced in parallel with production. If packaging artwork is still in revision when bulk cutting starts, packaging procurement can become the critical path.

04

QC Cadence

Inline inspection keeps issues off the critical path. Final-only AQL 2.5 is faster to schedule but leaves less room to rework if issues are found. Our default is inline inspection at each production stage plus a final AQL 2.5 gate.

Delivery FAQ

FAQ - Delivery, Lead Time, and Shipping

Short answers for buyers planning period underwear production, shipping routes, MOQ, seasonal timing, and urgent freight options.

How long does it take to manufacture custom period underwear?

72 hours for the first sample and 25-50 days for bulk production from sample confirmation, depending on order volume. These are indicative benchmarks; the confirmed date is set per purchase order after tech-pack and capacity review.

What is the difference between your two shipping routes?

The US route ships FOB Shenzhen to the buyer's assigned Amazon fulfillment center, and the buyer handles US customs clearance. The EU/UK/CA route ships DDP to the destination FBA or 3PL, with customs, duty, and last-mile freight included in the landed cost.

What Incoterms do you offer?

DDP to destination is the default for EU, UK, and Canada. FOB Shenzhen is standard for the US. EXW and other terms are available on request for buyers who prefer to manage freight directly.

How does MOQ affect lead time?

MOQ does not directly change the production lead time. The 50-piece minimum exists because cutting fewer than 50 units per color per size is inefficient on industrial cutting tables. Reorders at 100 and 500 pieces benefit from pre-staged materials and faster line setup.

What happens to my timeline during Chinese New Year?

Our factory closes for 2-3 weeks during Chinese New Year, usually from late January to mid-February depending on the lunar calendar. We recommend placing POs by December 10 to help complete production before the shutdown.

Can you ship directly to Amazon FBA?

Yes. For the US, orders are prepared at our Shenzhen facility and tendered to the assigned fulfillment center. For EU, UK, and Canada, goods can ship DDP directly to the destination FBA or 3PL. Full packaging specifications are documented on our Amazon FBA packaging page.

Do you handle air freight for urgent orders?

Yes. Air freight is commonly used for urgent replenishment, Prime Day preparation, or Q4 restocks when the ocean cutoff has passed. It is quoted per shipment, so your account manager can compare air and ocean options.

How do you protect my design files and customer data?

All buyers sign a mutual NDA before sharing a tech pack. Production data is isolated per client, and our contract includes a non-compete clause so we will not manufacture your core SKU for a competitor in the same market.

Start your timeline

Ready to Start Your Production Timeline?

Two ways to begin. Send your tech pack, target volume, destination market, SKU count, and Incoterms preference. We return a sample timeline, landed-cost estimate, shipping route, and material recommendations within 12 working hours.

OEKO-TEX 26.HCN.12213PFAS-Free EFW726020391ISO 9001 62726Q00153R001ISO 14001 62726E00103R001AQL 2.5Defect rate <1.5%22 sewing + 4 bonding lines